AK Engineering Company was the general contractor for general construction works in the production of the first stage of the elevator (complex of reception, purification, drying and storage of grain).
Elevator
"Andriyashevskiy"
Phase one of the construction project
2012 – 2013
general contract for general construction works
Capacity of simultaneous storage of grains and oilseeds of the first stage elevator - 40 thousand cubic meters., the total capacity - 160 thousand cubic meters.
The complex consists of metal silos of various sizes with transport galleries, receiver with a cleaning room, waste bins dust weight, administrative building and other structures.